Sunday, April 2, 2017

ASD Haulout Completed

Well the dinghy and davit are installed and ASD is back in the water. Due to the rain, we could get everything done we wanted too, but she is shining nicely.

Guyer Boats out of Ferndale WA did our install. He made first beefed up the swim platform with SS brackets he made on site. He told me that the stern is solid fiberglass with no fillers, above and below the water line, so that made me feel good. He then installed the davit, ran the wiring and the remote switch. The next day we put the dink in the water, measured for the cables and we are good to go.

With the dink in the harness, the davit sucks it in at the bend. When we are going around or in big water we need to add additional SS straps which he will be send me a set (he forgot them).

The Admiral and I took it out yesterday and the lowering and lifting is quite easy and fast. I will be bring a tow strap this year but most likely won't use it.

The brackets installed below and above the waterline

These are the heavy duty brackets they made to beef up the swim platform

Top part of the davit (lifting mechanism)



ASD's Tender

Check out ride with dealer

A Loon keeping us company

Installed and lifted out of the water.



Heading to the Winter Dock

Pulling out of Ilwaco WA

Coming into Winter Dock after a long 7 hour cruise from Ilwaco



No comments:

Post a Comment