Thursday, February 23, 2017

Low Pressure tubing installed

The Low pressure plumbing is done with the exception of the brine dump.  Plan on running that up to a sink drain.

In the pics none of the tubing is tied down yet.

I hung the membranes on the ceiling in the ER.  Just have to watch your head when entering or existing the ER.

Waiting on my high pressure hoses to get here.  We also have a scheduled haul out at the end of March for annual maintenance and new davit system install.



No comments:

Post a Comment